• Home
  • About Us
    • Audio Edition
    • Previous Issues
    • Submissions
    • Contact Us
  • Subscribe
  • Advertise
    • Audience
    • Editorial Calendar
    • Sizes & Specs
  • Jobs
    • View Open Positions
    • List Your Job

Permian Basin Oil and Gas Magazine

PBOG is the Official Publication of the Permian Basin Petroleum Association and is published monthly by Zachry Publications, LP.

  • News
  • PBPA
    • Legislative Matters
  • Business & Analysis
  • Service Articles
    • Automation, Controls and Measurement
    • Environmental, Safety and Training
    • Fracking, Frac Sand and Water
    • Infrastructure
    • Pipe and Pipe Service
    • Technology
    • Wireline and Testing
  • Legal Articles
  • Drilling Deeper
  • Permit Map

Company Delivers Turbomachinery

January 1, 2025 by PBOG

Mitsubishi Heavy Industries Compressor International Corporation (MCO-I), a leader in the design and manufacturing of compressors, steam turbines, and associated auxiliaries, announced Dec. 3 they have successfully manufactured, tested, and shipped steam turbine driven compressor packages (turbomachinery) to Golden Triangle Polymers Company, a Chevron Phillips Chemical Company (CPChem) and QatarEnergy joint venture, for their world-scale 2,080 KTA ethane cracker located in Orange County, Texas. The Golden Triangle Polymers project is an $8.5B integrated polymers facility consisting of both an ethane cracker and two polyethylene units located on 1,600 acres. MHI Compressor’s equipment scope included the supply of three main compressor packages critical to the ethane cracker’s operation: cracked gas, propylene refrigerant and ethylene refrigerant compressors—all being driven by special purpose steam turbines. In addition, the supply included critical auxiliary equipment such as surface condensers, integrated turbine compressor controls and lube oil consoles. The scope encompassed a total of three API 612 steam turbines and four API 617 centrifugal compressors. Once in operation, the cracked gas compressor train will be one of the largest and highest horsepower trains in operation globally. ical auxiliary equipment such as surface condensers, integrated turbine compressor controls and lube oil consoles. The scope encompassed a total of three API 612 steam turbines and four API 617 centrifugal compressors. Once in operation, the cracked gas compressor train will be one of the largest and highest horsepower trains in operation globally.

Clayton Jurica, vice president of sales, MCO-I, said, “Our relationship with both CPChem and QatarEnergy spans 20+ years of successful equipment supply, as well as outage services at their existing operations. We’re thrilled that they’ve partnered together on this industry critical project on the U.S. Gulf Coast. Over the last two years, the MHI team has been focused on the manufacturing and successful testing of our best-in-class turbomachinery in support of the joint venture’s growth project.”

The compressors and steam turbines were manufactured and tested by Mitsubishi Heavy Industries Compressor Corporation (MCO) at its factory in Hiroshima, Japan. MCO-I Houston is now providing installation services on site as well as engineering support during the current construction phase of the mega-project. The plant currently is planned for start-up in 2026.

Turbomachinery to be employed at an ethylene plant on MCO’s test stand in Hiroshima, Japan

Filed Under: Drilling Deeper

Subscribe to PBOG

Subscribe: Newsletter | Magazine

May 2025

May 2025

Read the most recent issue of PBOG on your computer, iPad, Kindle, phone or other electronic reader.

If you'd like to view our previous issues, click here.

PBOG Audio

Connect with us online.

Facebook spacer Twitter spacer LinkedIn
Privacy Policy

Cookie Policy

Permian Basin Oil and Gas Magazine

3457 Curry Lane
Abilene, TX 79606
325.673.4822
pbog@zacpubs.com

Search PBOG.com

© 2025 · Zachry Publications