• Home
  • About Us
    • Audio Edition
    • Previous Issues
    • Submissions
    • Contact Us
  • Subscribe
  • Advertise
    • Audience
    • Editorial Calendar
    • Sizes & Specs
  • Jobs
    • View Open Positions
    • List Your Job

Permian Basin Oil and Gas Magazine

PBOG is the Official Publication of the Permian Basin Petroleum Association and is published monthly by Zachry Publications, LP.

  • News
  • PBPA
    • Legislative Matters
  • Business & Analysis
  • Service Articles
    • Automation, Controls and Measurement
    • Environmental, Safety and Training
    • Fracking, Frac Sand and Water
    • Infrastructure
    • Pipe and Pipe Service
    • Technology
    • Wireline and Testing
  • Legal Articles
  • Drilling Deeper
  • Permit Map

Manufacturer Completes Alloy Tubulars Facility

August 1, 2024 by PBOG

Corrosion Resistant Alloys (CRA), a “just-in-time” manufacturer of corrosion-resistant alloy tubulars, announced the completion of construction at its state-of-the-art manufacturing facility in Brenham, Texas. The newly completed facility is designed to expand manufacturing capabilities and capacity, streamline processes, and respond to the dynamic needs of the industry and energy sectors. CRA states that this facility will enable them to offer customers faster tailor-made solutions to meet their evolving demands.

Phase I of the facility, situated on a 40+ acre campus, is comprised of a cold pilger mill, rotary and press straighteners, various computer numerical control (CNC) machines and machine tools, a concrete pipe storage yard, and pipe inspection facilities.

Upon completion of construction, CRA began the installation of the cold pilger mill set to enhance their capabilities beyond that of their operational mill in Ohio. The expanded capabilities of this mill include the ability to accommodate larger outer diameters (OD) from 3.543 up to 13.5 inches, heavier wall thickness ranging from 0.175 up to 2.5 inches, and longer lengths of up to 70 feet.

Cole Patchell, president of CRA, said, “This project is the culmination of more than a decade of planning. We are excited to be able to offer increased capacity, enhanced capabilities, and increased speed. While construction is complete, commercial operations at this facility are dependent upon our mill installation timeline and the successful completion of a series of internal trials to ensure our strict standards for quality, reliability, and safety are met.”

The new manufacturing facility is located at 4300 Hwy 290 E, Brenham, Texas.

CRA

Filed Under: PBOG Newsletter

Subscribe to PBOG

Subscribe: Newsletter | Magazine

May 2025

May 2025

Read the most recent issue of PBOG on your computer, iPad, Kindle, phone or other electronic reader.

If you'd like to view our previous issues, click here.

PBOG Audio

Connect with us online.

Facebook spacer Twitter spacer LinkedIn
Privacy Policy

Cookie Policy

Permian Basin Oil and Gas Magazine

3457 Curry Lane
Abilene, TX 79606
325.673.4822
pbog@zacpubs.com

Search PBOG.com

© 2025 · Zachry Publications