• Home
  • About Us
    • Audio Edition
    • Previous Issues
    • Submissions
    • Contact Us
  • Subscribe
  • Advertise
    • Audience
    • Editorial Calendar
    • Sizes & Specs
  • Jobs
    • View Open Positions
    • List Your Job

Permian Basin Oil and Gas Magazine

PBOG is the Official Publication of the Permian Basin Petroleum Association and is published monthly by Zachry Publications, LP.

  • News
  • PBPA
    • Legislative Matters
  • Business & Analysis
  • Service Articles
    • Automation, Controls and Measurement
    • Environmental, Safety and Training
    • Fracking, Frac Sand and Water
    • Infrastructure
    • Pipe and Pipe Service
    • Technology
    • Wireline and Testing
  • Legal Articles
  • Drilling Deeper
  • Permit Map

Nitrogen Rejection Unit Erected in West Texas

June 1, 2024 by PBOG

BCCK, a leader in engineering, procurement, fabrication and field construction services, announced April 1 another award of a NiTech Dual Tower Nitrogen Rejection Unit (NRU) to be located in West Texas.

The newly awarded 160 MMSCFD NiTech Dual Tower NRU utilizes cutting-edge technology to extract nitrogen from the residue gas of a cryogenic gas processing facility. This advanced unit boasts a modular, skidded design and its producers claim it is unmatched in its capability of handling high and low inlet nitrogen streams.

Greg Hall, executive vice president, BCCK, said, “BCCK’s NiTech NRU technology is our bread and butter. We have unrivaled experience with relatively low inlet nitrogen projects that have ‘just enough’ nitrogen to be considered off-spec. We are seeing more and more operators facing this challenge, a challenge BCCK has met with a simple solution numerous times.”

In addition to BCCK’s continuous innovation and dedication to sustainability, the award of this NiTech style dual tower NRU marks yet another milestone in the company’s longstanding relationship with a repeat customer. This project underscores the trust and confidence that clients place in BCCK’s expertise and ability to consistently deliver exceptional results.

Amy Ontiveroz, director of project management, BCCK, said, “Project transparency coupled with a steadfast commitment to customer service is the cornerstone of successful projects as well as fostering repeat customers. Working with a repeat customer is a testament to BCCK’s proven technology and the quality and performance we deliver with every project.”

BCCK’s NiTech NRU process, refined over more than 30 years, has empowered customers to achieve their product specifications. Known for its environmentally friendly design, this technology ensures efficiency and cost savings through a smaller footprint and minimal operator attention.

BCCK’s NiTech dual tower nitrogen rejection unit in West Texas.

 

About BCCK

BCCK specializes in full EPC projects, including concept, engineering, design, fabrication, manufacturing, and complete construction services. Providing full EPC services helps BCCK improve project economics by being a single-source provider for all stages of a project. BCCK is also the industry leader in nitrogen rejection with its NiTech process. Headquartered in Midland, Texas, with a satellite engineering and sales office in The Woodlands, Texas, BCCK was founded in 1980 and holds numerous technology patents. For more information, visit www.bcck.com.

Filed Under: Drilling Deeper

Subscribe to PBOG

Subscribe: Newsletter | Magazine

May 2025

May 2025

Read the most recent issue of PBOG on your computer, iPad, Kindle, phone or other electronic reader.

If you'd like to view our previous issues, click here.

PBOG Audio

Connect with us online.

Facebook spacer Twitter spacer LinkedIn
Privacy Policy

Cookie Policy

Permian Basin Oil and Gas Magazine

3457 Curry Lane
Abilene, TX 79606
325.673.4822
pbog@zacpubs.com

Search PBOG.com

© 2025 · Zachry Publications