• Home
  • About Us
    • Audio Edition
    • Previous Issues
    • Submissions
    • Contact Us
  • Subscribe
  • Advertise
    • Audience
    • Editorial Calendar
    • Sizes & Specs
  • Jobs
    • View Open Positions
    • List Your Job

Permian Basin Oil and Gas Magazine

PBOG is the Official Publication of the Permian Basin Petroleum Association and is published monthly by Zachry Publications, LP.

  • News
  • PBPA
    • Legislative Matters
  • Business & Analysis
  • Service Articles
    • Automation, Controls and Measurement
    • Environmental, Safety and Training
    • Fracking, Frac Sand and Water
    • Infrastructure
    • Pipe and Pipe Service
    • Technology
    • Wireline and Testing
  • Legal Articles
  • Drilling Deeper
  • Permit Map

Tellurian proposing 626-mile pipeline from Permian Basin to Lake Charles

January 30, 2020 by PBOG

Landowners along the proposed 626-mile path of Permian Global access pipeline in Texas and Louisiana began receiving letters last month from Tellurian. The project is being designed to transmit 2 billion cubic feet per day of natural gas from west Texas to Lake Charles, La., by late 2023 or early 2024. It was proposed in 2017 as part of Tellurian’s plan to form a $7 billion pipeline network with the proposed Driftwood LNG terminal in Lake Charles.

Filed Under: PBOG Newsletter

Subscribe to PBOG

Subscribe: Newsletter | Magazine

May 2025

May 2025

Read the most recent issue of PBOG on your computer, iPad, Kindle, phone or other electronic reader.

If you'd like to view our previous issues, click here.

PBOG Audio

Connect with us online.

Facebook spacer Twitter spacer LinkedIn
Privacy Policy

Cookie Policy

Permian Basin Oil and Gas Magazine

3457 Curry Lane
Abilene, TX 79606
325.673.4822
pbog@zacpubs.com

Search PBOG.com

© 2025 · Zachry Publications