• Home
  • About Us
    • Audio Edition
    • Previous Issues
    • Submissions
    • Contact Us
  • Subscribe
  • Advertise
    • Audience
    • Editorial Calendar
    • Sizes & Specs
  • Jobs
    • View Open Positions
    • List Your Job

Permian Basin Oil and Gas Magazine

PBOG is the Official Publication of the Permian Basin Petroleum Association and is published monthly by Zachry Publications, LP.

  • News
  • PBPA
    • Legislative Matters
  • Business & Analysis
  • Service Articles
    • Automation, Controls and Measurement
    • Environmental, Safety and Training
    • Fracking, Frac Sand and Water
    • Infrastructure
    • Pipe and Pipe Service
    • Technology
    • Wireline and Testing
  • Legal Articles
  • Drilling Deeper
  • Permit Map

Three Liquefaction Trains on Tap For NextDecade’s LNG Project

September 1, 2023 by PBOG

Baker Hughes announced in July it has been awarded an order by Bechtel Energy Inc.—to be booked in the second quarter of 2023—to supply three Main Refrigerant Compressors (MRCs) for NextDecade’s Rio Grande LNG project in the Port of Brownsville, Texas. In total, Baker Hughes will supply six Frame 7 gas turbines paired with 18 centrifugal compressors across Rio Grande’s first three LNG trains in a parallel configuration arrangement, providing more operational flexibility—for a nameplate capacity of 17.61 MTPA. “This order builds on our longstanding relationship with Bechtel and is a significant milestone in our partnership with NextDecade, supporting them on this key LNG project,” said Ganesh Ramaswamy, executive vice president of Industrial and Energy Technology at Baker Hughes. “We are delighted that our proven and reliable technology solution will support the production of LNG in the United States, which is crucial in balancing energy affordability, security, and sustainability globally.”

The Baker Hughes gas technology solution chosen for Rio Grande LNG provides NextDecade with the highest production levels for the plant’s design, as well as operational flexibility and high availability. The Frame 7 gas turbine is well-proven for its energy efficiency, availability, reliability and maintainability. Packaging of the turbine/compressor train, a unique Baker Hughes offering, as well as assembly of the compressors and testing of the trains, will take place at Baker Hughes’ facilities in Italy.

Building on almost 40 years of experience in the LNG space, Baker Hughes continues to help meet global energy demand by providing advanced, efficient and reliable solutions for the U.S. natural gas export sector. The announcement follows another recent contract awarded by Bechtel to Baker Hughes to supply two liquefaction trains for another LNG project in Texas, announced in March 2023.

 

About Baker Hughes

Baker Hughes is an energy technology company that provides solutions to energy and industrial customers worldwide. Built on a century of experience and conducting business in over 120 countries, our innovative technologies and services are taking energy forward—making it safer, cleaner, and more efficient for people and the planet. Visit them at bakerhughes.com.

Filed Under: Drilling Deeper

Subscribe to PBOG

Subscribe: Newsletter | Magazine

June 2025

June 2025

Read the most recent issue of PBOG on your computer, iPad, Kindle, phone or other electronic reader.

If you'd like to view our previous issues, click here.

PBOG Audio

Connect with us online.

Facebook spacer Twitter spacer LinkedIn
Privacy Policy

Cookie Policy

Permian Basin Oil and Gas Magazine

3457 Curry Lane
Abilene, TX 79606
325.673.4822
pbog@zacpubs.com

Search PBOG.com

© 2025 · Zachry Publications